top of page

TrueBeam Vault, Birmingham, AL

AIC was contracted to thicken the existing vault walls by over 1' for the installation of a new TrueBeam Linear Accelerator. The work took place in an active medical facility with an operating CT machine in the adjacent room. AIC developed a pump hose enclosure system to protect the hospital finishes in the event of a blow out during the pumping process. 

bottom of page